Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4863578 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Corrigendum : Improvement Of Link Road At Aliya Bagh Shalimar Bwo P/l Of G1, 50mm Bm, 25mm Sd With Premixed Seal Coat |
| Last Date For Submission | 11th Aug, 2026 |
| Opening Date | 12 Aug, 2026 |
| Document Cost | 200.00 |
|---|---|
| EMD | 4340.00 |
| Estimated Cost | 217000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 10 | No. |
| 2 | Providing and laying of Nallahmuck/ khak bajri including sorting, spreading to template, watering, dressing, ramming and consolidating with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load (if any) and carriage of materials from nearest approved source to site of work complete. | 26.25 | Cum |
| 3 | Supply/ stacking and laying of WBM Grade 2 with specified graded stone aggregate 63mm to 45mm size broken quarry stone @ 0.91 cum to 1.07 cum per 10 sqm of road surface and using of screening 13.2mm size @ 0..12 cum to .15 cum per 10sqm and binding material @ 0.06cum to 0.09 cum per 10sqm of road surface incl sorting , spreading to template , watering and consolidation to required gradient and camber with 80 to 100 KN Road roller all inclusive leads ,lifts , loading , unloading , head load if any and carraige of materials from nearest approved source to site of work complete ( to be laid as per the guidelines of MOST Specifications). Finished work to be measured and paid. | 13.12 | Cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of VG 10 grade including heating the bitumen and spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally brooming the surface as per required specification. (Including cost & carriage of all materials involved upto site of work complete). | ||
| 5 | On WBM surface using tar @0.75kg/sqm. | 175 | Sqm |
13 Days Left