Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4333732
Organisation NamePublic Works Department
Tender BriefCorrigendum : Improvement / Upgradation Of Boulevard Roads By Way Of 50mm Thick Bm, 40mm Dense Patches.
Last Date For Submission3rd Jun, 2026
Opening Date04 Jun, 2026
Cost
Document Cost1100.00
EMD76640.00
Estimated Cost3832000.00
Location
CitySrinagar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means).1868.46Sqm
2Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On B.T surface @ 0.50 Kg/Sqm6146.25Sqm
3Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specification to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-charge. 50mm compacted thickness with bitumen of grade VG-10 @ 3.50% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity including all carriages complete.15.37Cum
4Providing and laying Dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 0/50 mm compacted thickness with bitumen of grade CRMB- 60 @5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity.245.85Cum
5Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade / colour using hot thermoplastic material by fully / semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P cleaning the road surface of all dirt, seals, oil, grease and foreign material etc complete as per direction of EIC and accordance with applicable specifications.368.78Sqm