Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4595040 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Improvement Upgradation Of Sarbal Reshi Mohalla And New Colony At Ari By Way Of Macadamization Under Cnt Machine Mix Laid With Paver Incl P L Of Wet Mix In Stretches, Gsb Gii And Laying Of Rcc Pipes At Required Spots |
| Last Date For Submission | 29th Jun, 2026 |
| Opening Date | 30 Jun, 2026 |
| Document Cost | 1100.00 |
|---|---|
| EMD | 76982.00 |
| Estimated Cost | 3849108.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and Laying in Layers of not more than 20mm depth RBM/Nallah Muck/ Quarry Muck Including sring, spreading, watering and consolidation with PRR 8-10 tonne Including all Lifts and carriage complete (Max stone size not to exceed 150mm in any Direction) All Complete Job. | 71.17 | Cum |
| 2 | Supplying , stacking and Laying at site WBM GII stone aggregate of size 63 mm to 45 mm, Stone screening of size 13.2 mm nominal size (Type A) specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 41.07 | Cum |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 95.81 | Cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. | ||
| 5 | On W.M.M. surface using Tar @ 0.75 Kg/sqm. | 13.40 | Sqm |
5 Days Left