Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4782490 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Corrigendum : Improvement/upgradation Of Road From The H/o Bashir Ahmad Hajam To H/o Mohammad Yousuf Hajam At Astanpora Tailbal By Way Of Macadamization |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 1500000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 10 | No. |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 275 | Sqm |
| 3 | Clearance of road surface by way of engaging JCB including disposal of unserviceable material same beyond SMC limits including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 4 | Hours |
| 4 | Providing and laying of Nallahmuck/ khak bajri including sorting, spreading to template, watering, dressing, ramming and consolidating with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load (if any) and carriage of materials from nearest approved source to site of work complete. | 92.62 | Cum |
| 5 | Supply/ stacking and laying of WBM Grade 2 with specified graded stone aggregate 63mm to 45mm size broken quarry stone @ 0.91 cum to 1.07 cum per 10 sqm of road surface and using of screening 13.2mm size @ 0..12 cum to .15 cum per 10sqm and binding material @ 0.06cum to 0.09 cum per 10sqm of road surface incl sorting , spreading to template , watering and consolidation to required gradient and camber with 80 to 100 KN Road roller all inclusive leads ,lifts , loading , unloading , head load if any and carraige of materials from nearest approved source to site of work complete ( to be laid as per the guidelines of MOST Specifications). Finished work to be measured and paid. | 55.16 | Cum |
16 Days Left