Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4549988 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Macadamization / Upgradation Of Main Lane Toiba Colony Peer Bagh Srinagarmacadamization / Upgradation Of Main Lane Toiba Colony Peer Bagh Srinagar |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 800.00 |
|---|---|
| EMD | 38780.00 |
| Estimated Cost | 1643000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). | 714.00 | Sqm |
| 2 | Providing, laying, spreading of 75mm thick compacted wet mix macadam on prepared sub grade/sub-base with crushed quarry stone agg. of specified grading as per IRC/ MOST/MORTH specifications incl. mixed crushed material with predetermined quantity of water in accordance with specifications to form dense mass laying in uniform layers with paver in sub-base/base coarse on well prepared surface rolled with vibratory roller of 8/10 tonne capacity, speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade & cross section the mixing is to be prepared in approved mechanical mixing plant of suitable capacity & carriage of mixed material by tipper upto site of work complete incl. cost & carriage of all material upto site of work. | 12.00 | Cum |
| 3 | Providing and applying tack coat using hot straight run bitumen of VG-10 grade incl. heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning & preparing the existing road surface to remove all dirt, dust, mud etc. & finally brooming the surface as per required specification incl. cost & carriage of bitumen. | ||
| 4 | On WBM surface @ 0.75 Kg/Sqm | 160.00 | Sqm |
| 5 | On BT surface @ 0.50 Kg/Sqm | 2008.00 | Sqm |
3 Days Left