| Tender ID | 4782494 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Corrigendum : Macdamisation Of Road At Housing Colony Near Ghat Park Bagh E Mehtab |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 1500000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 820 | Sqm |
| 3 | Providing and applying tack coat using hot straight run bitumen of VG 10 grade including heating the bitumen and spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally brooming the surface as per required specification. (Including cost & carriage of all materials involved upto site of work complete). | ||
| 4 | On BT surface using tar @0.5 kg/sqm. | 1686.25 | Sqm |
| 5 | Providing/ laying 50mm thick compacted bituminousmacadam base course with stone aggregate of quality, size and grading as per specified in most specification and straight run bitumen of VG 10 @ 3.3% by weight of total mix including hot mixing of stone aggrt. and bitumen in hot mix plant transporting and laying mixed material with paver finisher to the required level and grade. rolling with road roller of 8 to 10 ton capacity to achieve the required compaction and density (including cost & carriage of all materials involved upto site of work complete). | 84 | Cum |