Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4789356 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Corrigendum : Providing And Laying Of Sewer Network Including Sump Well In Balance And Unconnected Areas Falling Under The Jurisdiction Of Sub Division 2nd Incl. Baghwanpora Naqashpora Ashai Bagh Kathi Darwaza Hassanabad Munwarabad Khanyar Boulevard |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | 21 Jul, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 810340.00 |
| Estimated Cost | 40517000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed ( All kinds of soil). | 2867.62 | Cum |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: (All kinds of soil). | 4132.68 | Cum |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 4233.93 | Cum |
| 4 | Supply & laying of stone soling in horizontal on level including ramming, Watering and dressing (Complete Job). | 378.64 | Cum |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: |
4 Days Left