Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3916641 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Srinagar Chrar-i-sharief Road. |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 1100.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 5000000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply, stacking, laying, spreading and compacting of graded stone aggregate of (63mm to 45mm size) WBM G-II in uniform thickness including rolling with PRR 8-10 capacity in stages to proper grade and camber applying and brooming requisite type of stone screenings 13.2mm size and binding material to fill up the interstices of coarse aggregate watering compacting to required density (finished work shall be paid) with all leads, lifts and carriages as involved from source up to site of work complete job. | 90.00 | cum |
| 2 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). | 1875.00 | sqm |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 90.00 | cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. | ||
| 5 | On W.B.M. @ 0.75 Kg/sqm. | 1200.00 | sqm |
3 Days Left