Tendering Authority: Public Works Department
Tender ID4549945
Organisation NamePublic Works Department
Tender BriefCorrigendum : Upgradation/macadamization/ Development Of Road By Way Of Patches And Stretches From Baghat Chowk To Humhama Via Hyderpora
Last Date For Submission23rd Jun, 2026
Opening Date24 Jun, 2026
Cost
Document Cost800.00
EMD39000.00
Estimated Cost1653000.00
Location
CitySrinagar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means).1312.50Sqm
2Providing and applying tack coat using hot straight run bitumen of VG-10 grade incl. heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning & preparing the existing road surface to remove all dirt, dust, mud etc. & finally brooming the surface as per required specification incl. cost & carriage of bitumen.
3On BT surface @ 0.50 Kg/Sqm2531.25Sqm
4Providing & laying 50mm thick compacted premix bituminous macadam base course with stone aggregate of quality size & grading as specified in MOST/MORTH specification & straight run bitumen of VG-10 grade @ 3.50% by weight of total mix incl. hot mixing stone aggregate & bitumen in hot mix plant, transporting & laying mixed material with paver finisher to the reqd. level & grade, rolling with road roller of 8 to 10 tonne capacity to achieve the reqd. compaction & density incl. cost & carriage of all materials involved from source upto site of work complete incl. cost & carriage of bitumen.90.03Cum
5Providing and laying 25mm thick compacted semidense bituminous concrete using crushed aggregate satisfying the gradation set out in specifications with 5% binder content (By weight of total mix) bitumen of VG-10 grade @ 2.88 kgs/sqm with the aid of hot mix plant & paver finisher incl. rolling with 8 to 10 tonne capacity road roller to achieve the reqd. compaction & density incl. rolling & finishing complete incl. cost & carriage of all materials involved from source upto site of work complete incl. cost & carriage of bitumen2531.25Sqm
23rd Jun, 2026