| Tender ID | 4549945 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Upgradation/macadamization/ Development Of Road By Way Of Patches And Stretches From Baghat Chowk To Humhama Via Hyderpora |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 800.00 |
|---|---|
| EMD | 39000.00 |
| Estimated Cost | 1653000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). | 1312.50 | Sqm |
| 2 | Providing and applying tack coat using hot straight run bitumen of VG-10 grade incl. heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning & preparing the existing road surface to remove all dirt, dust, mud etc. & finally brooming the surface as per required specification incl. cost & carriage of bitumen. | ||
| 3 | On BT surface @ 0.50 Kg/Sqm | 2531.25 | Sqm |
| 4 | Providing & laying 50mm thick compacted premix bituminous macadam base course with stone aggregate of quality size & grading as specified in MOST/MORTH specification & straight run bitumen of VG-10 grade @ 3.50% by weight of total mix incl. hot mixing stone aggregate & bitumen in hot mix plant, transporting & laying mixed material with paver finisher to the reqd. level & grade, rolling with road roller of 8 to 10 tonne capacity to achieve the reqd. compaction & density incl. cost & carriage of all materials involved from source upto site of work complete incl. cost & carriage of bitumen. | 90.03 | Cum |
| 5 | Providing and laying 25mm thick compacted semidense bituminous concrete using crushed aggregate satisfying the gradation set out in specifications with 5% binder content (By weight of total mix) bitumen of VG-10 grade @ 2.88 kgs/sqm with the aid of hot mix plant & paver finisher incl. rolling with 8 to 10 tonne capacity road roller to achieve the reqd. compaction & density incl. rolling & finishing complete incl. cost & carriage of all materials involved from source upto site of work complete incl. cost & carriage of bitumen | 2531.25 | Sqm |