Tendering Authority: Public Works Department
Tender ID4549967
Organisation NamePublic Works Department
Tender BriefCorrigendum : Upgradation/macadamization/ Development Of Colony Roads Including Allied Links By Way Of Patches N Stretches In Umarabad Sector A, And B At Peerbagh.
Last Date For Submission23rd Jun, 2026
Opening Date24 Jun, 2026
Cost
Document Cost1600.00
EMD163716.00
Estimated Cost4931000.00
Location
CitySrinagar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means).1782.90Sqm
2Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.1050.00Sqm
3Providing and laying Nallah Muck including leveling, watering an consolidation with power road roller of 8 to 12 tonne capacity to required gradient and camber, all carriage complete.157.50Cum
4Supply and stacking of graded stone agg. at site of size range 63-45mm Grade IInd with stone screening /chipping 13.20mm size nominal size type A stone dust moorum (khak bajri) at site including all carriage and laying water bound macdam with specified stone agg. stone screenings and binding material incl.Screening sorting, spreading to template and consolidation with PRR with 8-10 tonne capacity etc complete.78.75Cum
5Providing, laying, spreading of 75mm thick compacted wet mix macadam on prepared sub grade/sub-base with crushed quarry stone agg. of specified grading as per IRC/ MOST/MORTH specifications incl. mixed crushed material with predetermined quantity of water in accordance with specifications to form dense mass laying in uniform layers with paver in sub-base/base coarse on well prepared surface rolled with vibratory roller of 8/10 tonne capacity, speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade & cross section the mixing is to be prepared in approved mechanical mixing plant of suitable capacity & carriage of mixed material by tipper upto site of work complete incl. cost & carriage of all material upto site of work.102.37Cum
23rd Jun, 2026

3 Days Left