| Tender ID | 4550001 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Upgradation/macadamization/ Development Of Arafat Lane N Lane 1 At Stadium Colony Natipora And Shah I Hamadan Colony Naik Bagh |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 1100.00 |
|---|---|
| EMD | 77660.00 |
| Estimated Cost | 3291000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearance of Berm incl. removal of vegetation , mulba etc & disposal of same beyond SMC limit complete. as per specification & directions of Engineer Incharge. | 1.00 | Job |
| 2 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1 km (by mechanical means). | 1484.44 | Sqm |
| 3 | Providing, laying, spreading of 75mm thick compacted wet mix macadam on prepared sub grade/sub-base with crushed quarry stone agg. of specified grading as per IRC/ MOST/MORTH specifications incl. mixed crushed material with predetermined quantity of water in accordance with specifications to form dense mass laying in uniform layers with paver in sub-base/base coarse on well prepared surface rolled with vibratory roller of 8/10 tonne capacity, speed of which should not exceed 5km/hour for each layer, rolling should continue till 98% density is achieved to approved grade & cross section the mixing is to be prepared in approved mechanical mixing plant of suitable capacity & carriage of mixed material by tipper upto site of work complete incl. cost & carriage of all material upto site of work. | 109.77 | Cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of VG-10 grade incl. heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning & preparing the existing road surface to remove all dirt, dust, mud etc. & finally brooming the surface as per required specification incl. cost & carriage of bitumen. | ||
| 5 | On WBM surface @ 0.75 Kg/Sqm | 1463.70 | Sqm |