Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4235146
Organisation NamePublic Works Department
Tender BriefCorrigendum : Upgradation Of Infrastructure Of Cooperative Training Institute Srinagar.
Last Date For Submission2nd Jun, 2026
Opening Date03 Jun, 2026
Cost
Document Cost5500.00
EMD722000.00
Estimated Cost36078000.00
Location
CitySrinagar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :1052Cum
2P/L stone soling (Hand packed) stone soling (size 150mm-230mm) before laying of mat, compacted consolidation rammed and filling the voids with fine sand all complete including carriage upto site of work with all head loads.236.7Cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)65.7Cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).43.66Cum
5Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in- charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level.328.57Cum
2nd Jun, 2026

6 Days Left

WhatsApp