Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4907858 |
|---|---|
| Organisation Name | Housing And Urban Development Department |
| Tender Brief | Corrigendum : Upgradation Of Link Road B/w Of Macadamization At Chinkral Mohalla |
| Last Date For Submission | 6th Aug, 2026 |
| Opening Date | 07 Aug, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 30000.00 |
| Estimated Cost | 1500000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 280 | Sqm |
| 3 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1KM by mechanical means. | 502.32 | Sqm |
| 4 | Preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing to camber and consolidation with road roller 8-12 tonne capacity including making good the undulation etc. with earth or quarry spoils etc. and disposal of surplus material upto dumping site as directed by engineer incharge including all costs and carriages complete. | 538.2 | Sqm |
| 5 | Supply, stacking and laying of WBM grade 1st with specified graded stone aggregate 90mm - 45mm size broken query stone @1.21cum to 1.43cum/10sqm of road surface duly hand packed including screening, sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid. | 53.82 | Cum |
12 Days Left