Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4889918
Organisation NamePublic Works Department
Tender BriefCorrigendum : Upgradation Of Work Of Steel Bridge With Iron Fencing On Both Sides Near Fisherman Colony Khonkhan Dalgate.
Last Date For Submission17th Jul, 2026
Opening Date18 Jul, 2026
Cost
Document Cost200.00
EMD7760.00
Estimated Cost388000.00
Location
CitySrinagar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.1309.24Kg
2Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns etc.29Sqm
3Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in- charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level16.37Cum
4Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded164.89Kg
5Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers specifications: Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture26.02Sqm