Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5022238 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Providing Of Water Connection From Darul Uloom To University Under Construction Chowkidar Quarter At Jammu University Campus At Rakhi Arth Bemina (under District Capex). |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 04 Aug, 2026 |
| Document Cost | 50.00 |
|---|---|
| EMD | 1000.00 |
| Estimated Cost | 50000.00 |
| City | Srinagar |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 42.460 | Cum |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge. | 7.490 | Cum |
| 3 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. i. 25mm dia. G.I. pipes. | 370.000 | Mtr |
| 4 | Providing, fixing of MS Fittings viz bends, tees, tail pieces etc. Of suitable degrees / size to be fabricated out of 8mm/10mm thick plate as per the requirement at site. This item also includes cost of lead, Spun yarn and lead caulking, lead beating with insertion of Spun yarn etc.. The fittings should be leak proof and should be painted with anti-corrosive red oxide primer and bituminous paint including all carriages, leads, lifts and cutting of pipes etc. Complete job. | 25.000 | kg |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 44.950 | Cum |
13 Days Left