Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4242055 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Construction Of Sultanpur Udhawamafee Chekdam Block-bhadohi, Bhadohi |
| Last Date For Submission | 28th May, 2026 |
| Opening Date | 28 May, 2026 |
| Document Cost | 854.00 |
|---|---|
| EMD | 250000.00 |
| Estimated Cost | 0.00 |
| City | Sultanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supply & Fixing of shila patt (size 3'x2.50') granite stone (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) | 1.00 | No. |
| 2 | Site clearance (Cutting, uprooting,and disposal of Behya,Elephant grass, light bushes etc beyond 30.0 mtr.Ch.4 item no.10A.) (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) | 1800.00 | Sqm |
| 3 | Earth work in correcting internal section by Porclain/JCB machines for bed width 8 to 16m, including internal sides slope cutting at required slope with all lead and lifts in all type soils with disposal on daula and top and outer slope of banks as directed by site in charge, including and partial dressing.for bed width (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) | 7666.94 | Cum |
| 4 | Earth work in Excavation in ordinary soil / sandy loam , clay of sand lift upto 1.50m and lead upto 30.00m and including filling watering ramming of excavated soil into the trenches or upto the space and sides on the foundation trenches or into the plinth and removal and disposal of surplus soil as directed by Engineer in charge upto a distance of 30.00m from the foundation trenches slush not flowing . (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) | 226.83 | Cum |
| 5 | C.C in 1:3:6 cement,coarse sand,stone ballast (20-50 mm)including cost of material at site labour,T&P etc required for proper completion of work. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) | 134.84 | Cum |
16 Days Left