Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4611927
Organisation NamePublic Works Department
Tender BriefCorrigendum : Improvement Of S.k Payeen Inner Links B.w.o Wet Mix, Bm, Sdbc
Last Date For Submission29th Jun, 2026
Opening Date30 Jun, 2026
Cost
Document Cost1100.00
EMD58260.00
Estimated Cost2913000.00
Location
CitySumbal
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Scarifying existing Bituminous road surfaceto a depth of 50mm and disposal of scarified material within all lifts and lead upto 1Km (By Mechanicla Means)1576.80sqm
2Providing, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge109.50cum
3Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On WBM @ 0.75kg/sqm1460.00sqm
4Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On BT @ 0.50kg/sqm1576.80sqm
5Providing and laying 50mm thick premix bituminous macadam base coarse with stone aggregates of quality size and grading as specified in CPWD specifications and straight run bitumen of V.G 10 grade @ 3.30 % by weight of total mix that is @ 60 kg / cum including hot mixing of stone aggregate and bitumen in hot mix plant , transporting and laying mixed material with paver finisher to the required level and grade , rolling with power road roller of 8-10 ton capacity to achieve the required compaction and density including cost and carriage of all materials involved up to site of work complete , tools , plants, equipments and all allied machinery , labor ,taxes , fee, testing charges for maintaining quality control during and after execution of work complete in all respects including cost and carriage of material.151.84cum
29th Jun, 2026

8 Days Left

WhatsApp