Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4611921
Organisation NamePublic Works Department
Tender BriefCorrigendum : Improvement Of Takiya Chewa And Laman Road B.w.o Wet Mix, Bm, Sdbc
Last Date For Submission29th Jun, 2026
Opening Date30 Jun, 2026
Cost
Document Cost1100.00
EMD58440.00
Estimated Cost2922000.00
Location
CitySumbal
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge including carriage.210.79cum
2Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On WBM @ 0.75kg/sqm2810.50sqm
3Providing and laying 50mm thick premix bituminous macadam base coarse with stone aggregates of quality size and grading as specified in CPWD specifications and straight run bitumen of V.G 10 grade @ 3.30 % by weight of total mix that is @ 60 kg / cum including hot mixing of stone aggregate and bitumen in hot mix plant , transporting and laying mixed material with paver finisher to the required level and grade , rolling with power road roller of 8-10 ton capacity to achieve the required compaction and density including cost and carriage of all materials involved up to site of work complete , tools , plants, equipments and all allied machinery , labor ,taxes , fee, testing charges for maintaining quality control during and after execution of work complete in all respects including cost and carriage of material.140.525cum
4Providing and laying 25mm thick(compacted) semidensce bituminous concrete using mineral aggregates satisfying the gradation set out in specifications with 5% binder content( by weight of total mix) bitumen of V.G 10 grade @ 2.88 kg/sqm with the aid of hot mix plant and paver finisher including rolling with 8-10 ton capacity road roller to achieve the required compaction and density ( with bitumen of V.G 10 grade) including cost and carriage of all the materials involved complete , tools , plants, equipments and all allied machinery, labor ,taxes , fee, testing charges for maintaining quality control during and after execution of work complete in all respects including cost and carriage of bitumen.2810.50Sqm
5Providing and laying seal coat of premixed fine aggregate( passing 2.36mm and retained on 180 micron sieve ) with bitumen using 128.00 kg of bitumen of grade VG-10 per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road roller all complete as per MORTH specifications, including cost and carriage of all materials involved up to site of work complete.2810.50Sqm
29th Jun, 2026

8 Days Left

WhatsApp