Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4860550 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of 1no E Type Twin Quarter, 1 Nos D Type Quarter , 2 Nos F Type Twin Quarter Buildings At Motu Phc (n) |
| Last Date For Submission | 18th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 143000.00 |
| Estimated Cost | 14287502.00 |
| City | Sunabeda |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation and foundation of structures upto 3 mtr depth as per drawing and technical specification cluse 1104 including setting out construction of shoring and bracing removal of stumps all complete as per direction of Enginee-in-charge. D TYPE QUARTER | 70.270 | cum |
| 2 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 46.850 | cum |
| 3 | Supplying of filling sand in foundation and plinth including watering,ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of Engineer-In-Charge. | 57.820 | cum |
| 4 | Providing and laying plain cement concrete 1:4:8 (1 cement : 4 sand : 8 stone agregate 40mm nominal size) as levelling course in floor and plinth including tempering, curring, shuttering etc. complete all depth and height including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | 8.290 | cum |
| 5 | Providing and laying of Cement Concrete of grade 1: 3 :6 (1cement : 3 sand : 6 graded stone aggregate of size 25mm to 40 mm hard granite crusher broken metal ) , mixing in concrete mixer ,lowering and compacting in proper thickness , watering & curing for the required period .including all cost of labour ,material, conveyance,all taxes & royalities of materials, T & P etc.complete as per the directions of Engineer-in-charge. | 8.260 | cum |
11 Days Left