Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4460973 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of Pwd Road To Goudaguda In The District Of Koraput Under Mukhya Mantri Sadak Yojana (mmsy) For The Year 2026-27. |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 09 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 136000.00 |
| Estimated Cost | 13516000.00 |
| City | Sunabeda |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling, &trees girth upto 300 mm , removal of stumps of trees cut eralier & disposal of unserviceable material to be used or auctioned upto a lead of 1000 mtr including removal & disposal of top organic soil not exceeding 150 mm thickness as per direction of EIC | 5,600.000 | sqm |
| 2 | Construction of embankment with approved materials obtained from borrow pits transporting to site with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 and as per the direction of the Engineer-in-Charge. | 4,951.310 | cum |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 317.950 | cum |
| 4 | Excavation for roadwork in soil with hydraulic excavation of 0.9 cum bucket capacity including cuttinh and loading in tippers, trimming bottom and side slopes, in accordance with reuirements of lines, graddes and cross sections, and transporting to the embankment location within all lifts and leads upto 100m | 20.250 | cum |
| 5 | labour for laying Sub Base in layers not exceeding 225 mm watering & compacting to the required density in O.M.C with vibratory Roller including cost, conveyance, royality of all materials etc complete as per direction of Engineer-in-charge | 1,161.850 | cum |
6 Days Left