| Tender ID | 4438513 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Package No Or-20-644 (l053-rd Road To Tumbapadar) Under Pmgsy-iv Batch-i |
| Last Date For Submission | 17th Jun, 2026 |
| Opening Date | 18 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 291000.00 |
| Estimated Cost | 14565000.00 |
| City | Sunabeda |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 Below foundation | 57.07 | Cum |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 Slab | 6.93 | Cum |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 11100.00 | Sqm |
| 4 | Earth work in all kinds soil or ordinary soil in embankment, roads with M.D.D. not less than 1.44gm/1.65gm per cc upto 3mtr high & top 0.5mtr below sub-grade level respectively with initial lead & lift from borrow pit 5m. away from the toe line of final section including rough dressing , breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.23m in depth etc. including removing all debrises & benching old embankment complete (As per item 2(d) of AR-2006 Page-3). With mechanical lead upto 1000m | 9207.85 | Cum |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 58.69 | Cum |