Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4441275 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Package No Or-19-751 (l201-pwd Road To Tapagonda) Under Pmgsy-iv Batch-i |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 06 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 151000.00 |
| Estimated Cost | 7553000.00 |
| City | Sunabeda |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction work | ||
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 1800.00 | Sqm |
| 3 | Construction of embankment with approved materials deposited at site from road way cutting and excavation from drain & foundation of other strutures graded & compacted to meet the requirement of Tables 300.1 & 300.2 as per clause no.301of MORD specification for Rural roads and as per direction of Engineer-In-Charge. | 112.17 | Cum |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, inaccordance with requirements of lines, grades and cross sections, and transporting to the embankement location with a lift of up to 1.5m and lead up to 1000m as per techincal specification clause 302.3 | 39.60 | Cum |
| 5 | Earth work in excavation for foundtion of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material dressing of sides and bottom and backfilling in trenches excavated suitable material. | 160.24 | Cum |
5 Days Left