Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4427991 |
|---|---|
| Organisation Name | Mahanadi Coalfields Limited |
| Tender Brief | Corrigendum : Repairing Of Pqc Road From Bankibahal Chowk To Siarmal Chowk At Kulda Ocp Of Basundhara Area. |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 153300.00 |
| Estimated Cost | 12262415.00 |
| City | Sundergarh |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools,breaking to pieces not exceeding 0.02cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000metres, stacking serviceable and unserviceable materials separately. | 601.650 | CUM |
| 2 | Carriage of Materials By Mechanical Transport including loading,unloading and stacking Sand, stone aggregate below 40 mm nominal size Lead - 3. | 601.650 | CUM |
| 3 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications ). | 1317.900 | CUM |
| 4 | Preparation and consolidation of subgrade with road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with power roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth upto 50 metres. | 2292.000 | Sqm |
| 5 | Supplying and stacking of stone boulder 15cm to 22.5 cm size of hard granite or equivalent as approved by EIC at work site including stacking along road side equidistantly and uniformly including royalty, octroi, etc. with all lead and lift (A deduction of 15% is to be made on account of voids in stone boulder. Measurement of material is to be taken just before laying work starts and payment shall be made only after laying of the material) | 515.700 | CUM |
3 Days Left