Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3891919 |
|---|---|
| Organisation Name | Rail Coach Factory |
| Tender Brief | Supply Of End Wall Complete For Bangladesh Lhb First Ac Coaches. .note: Make/manufacturer Of Raw Material Shall Be M/s Jsl Or M/s Sail., As Per Drawing: Bae15001 Alt 'c' Fitted Along With Shutter Complete To Drg No. 2 10113.0.76.300.012 Alt '-r1', Packing Instruction: Pi187 Ver 2.0. [ Warranty Period: 84 Months After The Date Of Delivery ] |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Refer Documents |
|---|---|
| State | Punjab |
14 Days Left