Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Integral Coach Factory
Tender ID4001632
Organisation NameIntegral Coach Factory
Tender BriefSupply Of One Coach Set Of End Part For Air Conditioned Emu Trailer Coaches To Drg. Nos. Emu/c/ac-1-1-002, Col-iii, Alt 'd' -1 No, Emu/c/ac-1-1-003, Col-i, Alt 'c' -1 No. Special Condition : Special Condition: I) The Manufacturing Facility Requirement As Per Icf/md/spec-147,issue Status-01,rev-02, Amendment No.02. Ii) Body Bolster To Drg.no.icf/mrvc/c/ss-1-1-005,alt 'h', Col.i To Be Provided Without A)side Bearers To Drg.no.emu/m-1-1-027,alt 'z' Col-ii.b)grubscrews To Drg.no.icf/mrvc/c/ss-1-1-005, Alt 'h' Item-8, And C)side Bearer Covers To Drg.no.emu/m-1-1-027, Alt 'z' Item-1. Iii)the Under Frame End Part Should Be Supplied With Normal Side Up And Side Bearer Side Down. Details For Satge Inspection. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Sole Barwith Cross Members. # Assembly Of Body Bolster Arrangement. # Welding Of Ribs With Sole Bar. #placing & Welding Of Top Sheet Arrangement. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (c) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Final Product Inspection. Note: Applicationof Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrosion. Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Storage. [safety Item ]
Last Date For Submission28th Apr, 2026
Opening DateRefer to Documents
Cost
Document Cost0.00
EMD0.00
Estimated Cost0.00
Location
CityRefer Documents
StateTamil Nadu

Register to see full details

28th Apr, 2026

14 Days Left

WhatsApp