Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Eastern Railway
Tender ID3858615
Organisation NameEastern Railway
Tender BriefSupply Of Pu Paints Kit Consisting Of 7 Components : (1) Two Component Pu Top Coat Apricotyellow To Ral-0708040 Rdso's Spec. No M&c/pcn/100/2018 With Rdso's Amendment No. 1b(rev. 2.0effective From September 2020 As An Additional Requirement Qty Per Kit - 48 Ltrs. (2)two Component Pu Top Coat Blood Red To Ral-0303045 Rdso Spec. No-m&c/pcn/100/2018 With Rdso's Amendment No 1b ( Rev. 2.0 Effective From September 2020) As An Additional Requirement Qty Per Kit - 06 Ltrs. (3)two Component Pu Top Coat Paint Aluminium Rdso's Spec. No- M&c/pcn/110-2020 With Rdso's Amendment No. 1a (rev.1.0 Effective From June 2020) As An Additional Requirement , Qty Per Kit - 06 Ltrs. (4) Thinner Compatible Pu Top Coat Rdso Specn. No. M&c/pcn/100/2018, With Rdso'samendment No.1b (rev.2.0 Effective From September 2020) As An Additional Requirement Qty Per Kit - 20 Ltrs. (5) Unsaturated Polyester Based Knifing Putty Rdso Specn. No. M&c/pcn/100/2018, With Rdso'samendment No. 1b (rev.2.0 Effective From September 2020) As An Additional Requirement Qty Per Kit - 04 Kgs (6) Pu Surface Rdso Spec M&c/pcn/100/2018 With Rdso'samendment No. 1b (rev.2.0 Effective From September 2020) As An Additional Requirement Qty Per Kit - 5 Ltrs. (7) Epoxy Based Zinc Phosphate Primer (two Pack), Rdso's Specn- M&c/pcn/100/2018 With Rdso'samendment No. 1b (rev.2.0 Effective From September 2020) As An Additional Requirement Qty Per Kit - 5 Ltrs.shelf Life 12 Months. [ Warranty Period: 30 Months After The Date Of Delivery ]
Last Date For Submission17th Apr, 2026
Opening DateRefer to Documents
Cost
Document Cost0.00
EMD0.00
Estimated Cost0.00
Location
CityRefer Documents
StateWest Bengal

Register to see full details

17th Apr, 2026

20 Days Left