Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Urban Development And Urban Housing Department
Tender ID5010747
Organisation NameUrban Development And Urban Housing Department
Tender BriefAnnual Rate Contract For Repair/maintenance Work Of Existing Submersible Pump/mono Block Pump/open Well Submersible Pump/end Suction Pump Installed At Various Locations Of Central Zone For 03 (three) Years.
Last Date For Submission27th Jul, 2026
Opening DateRefer to Documents
Cost
Document Cost1062.00
EMD10000.00
Estimated Cost0.00
Location
CitySurat
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1REPAIRING OF MONO BLOCK PUMP MOTORS : Removing the pump set from foundation after removing suction & discharge connection pipes & all wiring connections taking it to workshop & open it for fault finding , refitting the same, after carrying out repairing, taking back on site refitting on foundation with pipe & wiring connections & put in working condition. (Excludes cost of repairing. Includes to & from transportation) (A) Up to 3 HP1.000Job
2REPAIRING OF MONO BLOCK PUMP MOTORS : Removing the pump set from foundation after removing suction & discharge connection pipes & all wiring connections taking it to workshop & open it for fault finding , refitting the same, after carrying out repairing, taking back on site refitting on foundation with pipe & wiring connections & put in working condition. (Excludes cost of repairing. Includes to & from transportation) (B) Above 3 HP to 7.5 HP1.000Job
3REPAIRING OF MONO BLOCK PUMP MOTORS : Removing the pump set from foundation after removing suction & discharge connection pipes & all wiring connections taking it to workshop & open it for fault finding , refitting the same, after carrying out repairing, taking back on site refitting on foundation with pipe & wiring connections & put in working condition. (Excludes cost of repairing. Includes to & from transportation) (C) 10 Hp to 20 HP1.000Job
4REPAIRING OF MONO BLOCK PUMP MOTORS : Removing deteriorated gasket, gland packing, washer nuts & bolts before refitting of motor pump set. (A) Up to 3 HP1.000Ea.
5REPAIRING OF MONO BLOCK PUMP MOTORS : Removing deteriorated gasket, gland packing, washer nuts & bolts before refitting of motor pump set. (B) Above 3 HP to 7.5 HP1.000Ea.
27th Jul, 2026

8 Days Left

WhatsApp