| 1 | Works of CONSTRUCTION OF EWS-II RESIDENTIAL FLATS & SHOPSINCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREADEVELOPMENT WORK AT T.P. SCHEME NO-37 (ALTHAN-SOUTH),F.P.129 UNDER PRADHAN MANTRI AWAS YOJNA 2.0-AHP ONENGINEERING-DESIGNING,PROCUREMENT AND CONSTRUCTIONBASIS (EPC MODE).(WORK NO. 05) Including, necessaryengineering survey, structural designing, and all constructingactivities like excavation, construction of all types of structure,finishing works like masonry work, plastering, painting, flooring etc,doors, windows, grills, and all internal and external amenities,electrification, internal & external electrification including cablelaying up to meter area for electrical utility services, DG Set, watersupply, drainage, network, Organic waste converter, storm waterdrain (if necessary as per opinion of SMC). R.C.C. roads, VDS andPaver block in marginal area, water proofing treatment, anti termitetreatment, lift-elevators, compound wall, Entry gate, fire fightingsystem, landscaping, Gas line network, rainwater harvesting with allmaterial and labour etc. as per minimum required specificationsstated in tender documents and Architectural Planning and designapproved by SMC, including all taxes, charges, royalties, etc.complete as mentioned in the scope of work of the tenderdocuments including all license to be obtained at the cost ofcontractor. | 320.000 | Nos. ofDUs. |
| 2 | Works of CONSTRUCTION OF EWS-II RESIDENTIAL FLATS & SHOPSINCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREADEVELOPMENT WORK AT T.P. SCHEME NO-37 (ALTHAN-SOUTH),F.P.129 UNDER PRADHAN MANTRI AWAS YOJNA 2.0-AHP ONENGINEERING-DESIGNING,PROCUREMENT AND CONSTRUCTIONBASIS (EPC MODE).(WORK NO. 05) Including, necessaryengineering survey, structural designing, and all constructingactivities like excavation, construction of all types of structure,finishing works like masonry work, plastering, painting, flooring etc,doors, windows, grills, and all internal and external amenities,electrification, internal & external electrification including cablelaying up to meter area for electrical utility services, DG Set, watersupply, drainage, network, Organic waste converter, storm waterdrain (if necessary as per opinion of SMC). R.C.C. roads, VDS andPaver block in marginal area, water proofing treatment, anti termitetreatment, lift-elevators, compound wall, Entry gate, fire fightingsystem, landscaping, Gas line network, rainwater harvesting with allmaterial and labour etc. as per minimum required specificationsstated in tender documents and Architectural Planning and designapproved by SMC, including all taxes, charges, royalties, etc.complete as mentioned in the scope of work of the tenderdocuments including all license to be obtained at the cost ofcontractor. | 320.000 | Nos. ofDUs. |
| 3 | Works of CONSTRUCTION OF EWS-II RESIDENTIAL FLATS & SHOPSINCLUDING ALL INTERNAL INFRASTRUCTURE SERVICES & AREADEVELOPMENT WORK AT T.P. SCHEME NO-37 (ALTHAN-SOUTH),F.P.129 UNDER PRADHAN MANTRI AWAS YOJNA 2.0-AHP ONENGINEERING-DESIGNING,PROCUREMENT AND CONSTRUCTIONBASIS (EPC MODE).(WORK NO. 05) Including, necessaryengineering survey, structural designing, and all constructingactivities like excavation, construction of all types of structure,finishing works like masonry work, plastering, painting, flooring etc,doors, windows, grills, and all internal and external amenities,electrification, internal & external electrification including cablelaying up to meter area for electrical utility services, DG Set, watersupply, drainage, network, Organic waste converter, storm waterdrain (if necessary as per opinion of SMC). R.C.C. roads, VDS andPaver block in marginal area, water proofing treatment, anti termitetreatment, lift-elevators, compound wall, Entry gate, fire fightingsystem, landscaping, Gas line network, rainwater harvesting with allmaterial and labour etc. as per minimum required specificationsstated in tender documents and Architectural Planning and designapproved by SMC, including all taxes, charges, royalties, etc.complete as mentioned in the scope of work of the tenderdocuments including all license to be obtained at the cost ofcontractor. | 320.000 | Nos. ofDUs. |