Tendering Authority: Gujarat State Police Housing Corporation Limited
Tender ID5601240
Organisation NameGujarat State Police Housing Corporation Limited
Tender BriefConstruction Of School Building (g+2), Boys Hostel (g+2), Girls Hostel (g+2), Staff Quarters (g+2), Mess Building (g+1), Class-iv Quarters (g.f), Infrastructure Etc. For Emrs School Campus At Mangrol (laveth), Dist.- Surat (including Electrification & Fire Fighting System) (gstes Priority - 2024-25) (deposit Work)
Last Date For Submission23rd Sep, 2026
Opening DateRefer to Documents
Cost
Document Cost18000.00
EMD5701873.00
Estimated Cost570187341.70
Location
CitySurat
StateGujarat

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for foundation in Dence and Hard Soil upto 1.5 mt depth including sorting out and stacking of useful materials and disposing of the excavated stuff upto any Lead and Lift.5261.600Cum
2Excavation for foundation in Hard Murrum upto 1.5 mt depth including sorting out and stacking of useful materials and disposing of the excavated stuff upto any Lead and Lift.7368.220Cum
3Excavation for foundation in Hard Murrum from 1.5 mt.to 3.0 mt. depth including sorting out and stacking of useful materials and disposing of the excavated stuff upto any Lead and Lift.3381.600Cum
4Excavation for foundation in Soft rock not requiring Blasting from 1.5 mt.to 3.0 mt. depth including sorting out and stacking of useful materials and disposing of the excavated stuff upto any Lead and Lift.2501.220Cum
5Providing and laying in position Ready Mixed M-150 grade concrete for reinforced cement conctere work, using cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for any lead having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying and finishing, Including providing formwork of Plywood only with fair finish and Proping must be of steel only so as to give fair finish the cost of centering, shuttering. Providing and Mixing admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer -in-charge. Without Fly Ash But Excluding Cost Of Reinforcement (Min cement level as per latest IS 456 shall be maintained) in Foundation and Plinth.855.660Cum