Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4270694 |
|---|---|
| Organisation Name | Works Department |
| Tender Brief | Construction Of Compound Wall, Approach Road With Paved Parking At Uphc, Talcher In The District Of Angul For The Year 2025-26 Under Dmf. |
| Last Date For Submission | 28th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 65000.00 |
| Estimated Cost | 6495614.00 |
| City | Talcher |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Civil Works Clearing & grubbing the road land including uprooting the rank vegetations, grasses, bushes, the shrub jungle & tree up to 1.00 m girth including basic cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as directed by theEngineer-in-charge | 2980.000 | Sqm |
| 2 | Earth work excavation in foundation trenches in all kinds of soil incluidng moorum stoney earth and earthmixed with boulders except sheet rock and boulders requiring blasting, including dressing and levelling the bed up to the required depth and depositing the excavated materials with all leads and lifts, T&P. shoring and shuttering if required etc. including labour cess but excluding GST complete as directed by the Engineer-in-charge | 174.430 | Cum |
| 3 | Supplying and filling foundation and plinth with sand well watered and rammed with basic cost, conveyance, royalities of all materials including labour cess but excluding GST complete | 30.770 | Cum |
| 4 | Filling foundation and plinth with excavated earth well wateted and rammed with basic cost, conveyance, royalities and of all materials complete including labour cess but excluding GST | 75.280 | Cum |
| 5 | Cement concrete (1:3:6) in foundation and floor i;e below the base course of terrazo flooring using 4cm (1 ) size black crusher hard broken granite aggregates / chips / metal of approved quality and from approved quarry, including lowering, laying concrete, watering curing etc. complete to required level laid in layers not exceeding 1'-6" thick including basic cost, conveyance, royalities of all materials and cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge | 30.770 | Cum |
Closed