Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Municipal Council
Tender ID4446134
Organisation NameMunicipal Council
Tender BriefImprovement Of Mcc-ii West Side In W.no.20
Last Date For Submission8th Jun, 2026
Opening Date09 Jun, 2026
Cost
Document Cost6000.00
EMD19970.00
Estimated Cost1997000.00
Location
CityTalcher
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. .14.720cum
2Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed with mechanical means 5km & carriage of earth etc all complete.325.875cum
3Supplying and filling in plinth with sand in under floors, including watering, ramming, consolidating and dressing complete11.530cum
4Providing and laying Plain Cement Concrete of proportion (1:4:8) in foundation using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge.3.930cum
5Providing and laying R,C,C, (1:1.5:3) using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; including the cost of centering & shuttering as per direction of the engineer-in-charge; (FOUNDATION)3.040cum
8th Jun, 2026

8 Days Left

WhatsApp