Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4446134 |
|---|---|
| Organisation Name | Municipal Council |
| Tender Brief | Improvement Of Mcc-ii West Side In W.no.20 |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 09 Jun, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 19970.00 |
| Estimated Cost | 1997000.00 |
| City | Talcher |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. . | 14.720 | cum |
| 2 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed with mechanical means 5km & carriage of earth etc all complete. | 325.875 | cum |
| 3 | Supplying and filling in plinth with sand in under floors, including watering, ramming, consolidating and dressing complete | 11.530 | cum |
| 4 | Providing and laying Plain Cement Concrete of proportion (1:4:8) in foundation using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 3.930 | cum |
| 5 | Providing and laying R,C,C, (1:1.5:3) using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including laying, curing, carriage for all leads; including the cost of centering & shuttering as per direction of the engineer-in-charge; (FOUNDATION) | 3.040 | cum |
8 Days Left