Tendering Authority: Nuclear Recycle Board
Tender ID4299884
Organisation NameNuclear Recycle Board
Tender BriefCorrigendum : Construction Of Rcc Internal Storm Water Drain (phase-i) At Inrpc Tarapur
Last Date For Submission24th Jun, 2026
Opening Date29 Jun, 2026
Cost
Document Cost0.00
EMD2200000.00
Estimated Cost120000000.00
Location
CityTarapur
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work excavation by mechanical means (Hydraulic excavator) /manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including shoring and dewatering (if necessary) and disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass ,etc. complete upto required depth and as directed by the Engineer-in-charge. From 0.00 to 1.50 m depth from average ground level32256Cum
2Extra Over above Item 1 initial depth for every additional depth of 1.5m or part thereof12313Cum
3Lead charges for Soil excavation for lead excceding 3 KM but not exceeding 4 KM by mechanical transport including loading unloading, stacking / levelling etc. as per the specifications and as directed by the Engineer-in-charge 19756Cum
4Murum filling under floors of specified thick in layers of not exceeding 150 mm thickness including consolidation etc. complete using murrum available at site as per the specifications and as directed by the Engineer-in-charge. Note: a) Only compacted volume will be measured and paid, b) Selected / approved excavated stuff stored within the DAE premises shall be issued free of cost to the contractor for filling purposes with a lead of upto 3 kms.500Cum
5Supplying, Stacking and Laying of 230 mm Thick rubble soling stones (with outside material) as under Floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge. Note: The contractor s quoted rate for approved rubble brought from outside shall include the royalty as per the prevailing Government rates. Any increase in prevailing rate of Royalty shall be borne by the Contractor at no extra cost to the Owner. 8582Sq.Mtr
24th Jun, 2026