Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3727214 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Addition/alteration/improvement To Pol, Salvage Store Of Logistic Section And Certain Sanctioned Works At Af Stn Thane Site (p) Under Ge (af)thane |
| Last Date For Submission | 3rd Apr, 2026 |
| Opening Date | 10 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 45000.00 |
| Estimated Cost | 2250000.00 |
| City | Thane |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of cement concrete of any description and in any position not provided and as in roof padding, roof curb etc complete all as specified and as directed. Note: - (a) Demolition should be done carefully to roof slab. (b) Any damage occurred in the roof surfaces during demolition shall be made good by the contractor without extra cost to the department. (c) Disposal of debris/retrieved materials shall be thrown out from site at a place shown by the Engineer-in-Charge. | 0.25 | CUM |
| 2 | -ditto- all as per item No 1.00 here in before but re-inforced cement concrete. | 0.25 | CUM |
| 3 | Material and labour for providing plain cement concrete 1:2:4 type B- 1( using 20mm graded stone aggregate) as in roof padding , roof kerbs or mud stops, rounded or chamfered on edges laid in slope as per requirement and mixed with integral water proofing liquid admixture as per manufacturer's instructions complete all as specified and as directed. Note : (i) Integral water proofing liquid admixture shall be measured and paid separately under appropriate item here in after. | 0.50 | CUM |
| 4 | M&L for rendering 15 mm thick (in two layers) in CM (1:4) on edges of concrete roof slab and chajjas surface finished even and smooth (without using extra cement) to get uniform level surface for laying of membrane treatement, using integral water proofing compound complete all as specified and directed. Note:- water proofing compound will be paid seprately. | 25.00 | SQM |
| 5 | Supply only integral water proofing compound. | 10.00 | KG |
6 Days Left