| Tender ID | 4247378 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Mrl-36 Harkul Budruk Nagave Road |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 19 May, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 74424.00 |
| Estimated Cost | 7442391.00 |
| City | Thane |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 1.00 Renewal BT surface and DLP maintaince (6 to 10 years) to Harkul budruk nagave Road Km 0/0 to 5/0 ( 5.0 km )Tal :- Kankavali Dist :- Sindhudurg | ||
| 2 | Clearing and grubbing Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Mord 2014 Clause 201. (A) In area of Non-thorny jungle | 0.60 | One Cubic Meter |
| 3 | Clearing and grubbing Road Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Mord 2014 Clause 201. (A) In area of Thorny jungle | 0.40 | One Cubic Meter |
| 4 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 1080.00 | One Cubic Meter |
| 5 | Modified Penetration Macadam Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification | 6825.00 | One Square Meter |