Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4606947 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Corrigendum : Amrut- Klm Ss-01 -zone A1 - Iron Bridge Zone Commissioning Of Sewerage System And Rehabilitation Of Existing Sewerage System, Extension Of The Sewerage Systems And Construction Of Pumping Station And Wet Well At Iron Bridge Zone - Sewerage Work |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 16540.00 |
|---|---|
| EMD | 500000.00 |
| Estimated Cost | 0.00 |
| City | Thiruvananthapuram |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Laying of new sewers ,Rehabilitation of existing sewerage net work including replacement of existing sewers of Iron Bridge station zone | ||
| 2 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 1900.000 | metre |
| 3 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 1800.000 | sqm |
| 4 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 130.320 | cum |
| 5 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 202.320 | cum |
17 Days Left