| Tender ID | 4227661 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Corrigendum : General-pazhavangadi Thodu At Pattoor- Urgent Reconstruction Of Damaged Left Side Wall Of Pazhavangadi Thodu At D/s Of Pattoor - General Civil Work |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 2760.00 |
|---|---|
| EMD | 31741.00 |
| Estimated Cost | 1269621.00 |
| City | Thiruvananthapuram |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Reconstructing Damaged side wall | ||
| 2 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 5.400 | cum |
| 3 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 24.000 | cum |
| 4 | OD16924/2025-2026:Providing and fixing sheet bund with 1.80 mtr height ,1 meter bottom width and 60 cm top width. Using 6 mm thick MS Sheet in two layers with outer layer frame fabricated using 50x50x6mm MS angle and Inner frame fabricated using 40x40x6 mm MS angle and connecting both layer of MS sheet using 100 x 50 x 8 mm. Fixing in position by using crane and filling earth inside the bund by excavator ,and removing and conveythe bund to the next location etc complete as per the direction of departmental officers at site | 20.000 | metre |
| 5 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 28.000 | metre |