Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala Road Fund Board
Tender ID3689282
Organisation NameKerala Road Fund Board
Tender BriefCorrigendum : Kiifb-pwd004-33-kodinada - Vazhimukku Road (1.56 Km) Including Balaramapuram Junction Development-karamana -kaliyikkavila Road (phase I -reach Iii)-general Civil Work
Last Date For Submission28th Mar, 2026
Opening Date30 Mar, 2026
Cost
Document Cost19518.00
EMD500000.00
Estimated Cost251543598.00
Location
CityThiruvananthapuram
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
11 SITE CLEARENCE AND DISMANTLING
22.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means3.111Hectare
32.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means145.737cum
42.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>91.915cum
52.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.1137.850cum
28th Mar, 2026

1 Days Left