| Tender ID | 3647294 |
|---|---|
| Organisation Name | Kerala University Of Digital Sciences Innovation And Technology |
| Tender Brief | Corrigendum : Works Of Academic Block Of Duk Building Water Proofing And Painting Works |
| Last Date For Submission | 30th Mar, 2026 |
| Opening Date | 31 Mar, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 0.00 |
| City | Thiruvananthapuram |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Waterproofing Treatment of Open Terrace (With Removal of Tiles) | ||
| 2 | OD311297/2025-2026 Removal of all existing tiles,tile adhesives and other loose particles till mother slab by mechanical /manual chipping till mother slab.Manual grinding to be done over the opened surface areas to remove all existing loose particles as a part of surface preparation. | 1.000 | L/s |
| 3 | OD311304/2025-2026 Removal,transportation and disposal of all loose constuction materials debris like tiles,cement,sand and other loose particles from the site to the diposal location. | 1.000 | L/s |
| 4 | OD311315/2025-2026 Identification of all visible cracks and cutting/opening the same in V groove shape. All loose and friable particles shall be completely removed from the opened cracks using compressed air/air blower. Filling of the prepared cracks with two-component elastomeric polyurethane sealant. C, mixed thoroughly using a slow-speed drill with paddle for a period of 3 to 4 minutes before pouring into the cracks. The filled cracks shall be allowed to cure properly( 24 to 48 hours), complete as per specifications and directions of Engineer-in-Charge. | 150.000 | Rmt |
| 5 | OD311316/2025-2026 All corner joints between the roof slab and parapet wall shall be thoroughly cleaned. Any undulations noticed shall be levelled by manual grinding. Two-component cementitious waterproofing coating shall be applied over all treated corner areas, to act as an adhesive layer. Joint sealing tape of three-ply construction, 75 mm width, shall be fixed and pressed onto the freshly applied adhesive layer, ensuring a minimum overlap of 50 mm. A smoothing trowel shall be used to remove wrinkles and level any unevenness or distortions. Two to three coats of the two-component cementitious coating shall then be applied, ensuring that the joint sealing tape is fully embedded and completely covered, complete as per specifications and directions of Engineer-in-Charge. | 288.000 | Rmt |