Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4857640 |
|---|---|
| Organisation Name | Kerala State Cooperative Federation For Fisheries Development Limited |
| Tender Brief | Foundation Work, Truss Work And Painting , Construction Of Canopy, Steps Using Rcc, And Plastering,repair Of Existing Platform Using Dr Masonry.,driving Of Coconut Pile To A Depth Of 8m For Tying The Boats.providing Interlock Near Diesel Tank Etc |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 1965.00 |
|---|---|
| EMD | 22281.00 |
| Estimated Cost | 891237.00 |
| City | Thiruvananthapuram |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction work | ||
| 2 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil | 0.432 | cum |
| 3 | 4.1.2 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1 :3 (1 Cement: 1 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.432 | cum |
| 4 | 50.10.1 Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.)trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 126.330 | kg |
| 5 | 12.1.2 Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I.limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( up to any pitch in horizontal / vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.80 mm thick with zinc coating less than 275 gm/m2 | 3.360 | sqm |