Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5026621 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Proj 187-vazhuthacaud Ward--maintenance Of Various Roads And Bylanes Of Gandhi Nagar,kokkiliar Lane And Thamburan Nagar And Rain Maintenance In Vazhuthacaud Ward |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 2760.00 |
|---|---|
| EMD | 42366.00 |
| Estimated Cost | 1694633.00 |
| City | Thiruvananthapuram |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Road Maintenance | ||
| 2 | 2.2.1.A:Clearing and Grubbing Road Land <br> Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.<br>(I) By Manual Means <br> (A) In area of non-thorny jungle | 0.048 | Hectare |
| 3 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 590.500 | sqm |
| 4 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 44.288 | cum |
| 5 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 107.710 | sqm |
6 Days Left