Tendering Authority: Local Self Government Department
Tender ID4857601
Organisation NameLocal Self Government Department
Tender BriefRetender Lac-ads-mla-lac-ads- 2025-2026-re-tarring Of Mudambu Nada Koyikkavilakam Road At Poovar Gp-general Civil Work
Last Date For Submission13th Jul, 2026
Opening Date15 Jul, 2026
Cost
Document Cost2760.00
EMD38769.00
Estimated Cost1550758.00
Location
CityThiruvananthapuram
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1ROAD
23.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.330.000sqm
33.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.112.600cum
44.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil.78.040cum
54.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead117.060cum