Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4268177
Organisation NameIrrigation Department
Tender BriefCorrigendum : General-emergency Works -mvip- Emergency Repair And Maintenance Work Of Flush Escape Shutter At Ch. 5886 M Of Piravom Branch Canal-general Mechanical Work
Last Date For Submission15th Jun, 2026
Opening Date17 Jun, 2026
Cost
Document Cost335.00
EMD841.00
Estimated Cost0.00
Location
CityThodupuzha
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Repair and panting of flush escape shutter
2OD41801/2025-2026:Clearing grass from banks of canal and removal of silt, zoological waste and other debris from canal shutter and grooves including removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.1.500Day
3OD18388/2024-2025:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embeded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site.(weight of the un-serviceable shutters and embedded parts mo-y be calculated as 60% and un-serviceable hoisting units as 80 % )792.576kg
485.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site15.321sqm
585.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site7.040sqm
15th Jun, 2026

15 Days Left