Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4268177 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Corrigendum : General-emergency Works -mvip- Emergency Repair And Maintenance Work Of Flush Escape Shutter At Ch. 5886 M Of Piravom Branch Canal-general Mechanical Work |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 335.00 |
|---|---|
| EMD | 841.00 |
| Estimated Cost | 0.00 |
| City | Thodupuzha |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Repair and panting of flush escape shutter | ||
| 2 | OD41801/2025-2026:Clearing grass from banks of canal and removal of silt, zoological waste and other debris from canal shutter and grooves including removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1.500 | Day |
| 3 | OD18388/2024-2025:Dismantling of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Unit / Embeded parts etc. of the same and stacking at a distance of 100 meter including hire of machinery labour etc. complete as directed by the departmental officer at the site.(weight of the un-serviceable shutters and embedded parts mo-y be calculated as 60% and un-serviceable hoisting units as 80 % ) | 792.576 | kg |
| 4 | 85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 15.321 | sqm |
| 5 | 85.115:Cost of painting with 2 coats of enamel paint over 1 coat of zinchromate primer as per IS1477:1994 after hand and power tool cleaning including cost of all materials, labour charges, cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site | 7.040 | sqm |
15 Days Left