| 1 | Shifting of Over Head Line upto a length of 210m with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mt PSC Pole - 5nos , 8 Mt PSC Pole - 1 no , Base plate - 6 Nos , Tapping channel - 12 Nos , 4 1/2 Cross arm - 4 Nos , HT TI Fitting - 4 Nos , 3 Ph Cross Arm - 30 Nos , S Ph Cross Arm - 11 Nos , LT TI Fitting - 1 no , Back Clamp 9 mt - 28 nos , Back Clamp 8 Mt -1 no , Stay clamp 9 Mt - 21 Pair , Stay clamp 8 Mt - 1 Pair , 22 KV Polymer Insulator - 24 Nos , 22 KV polymer Disc - 9 nos , HT Metal parts - 9 nos , LT Shackle - 48 nos , LT metal parts - 48 nos , LT pin insulator - 33 nos , LT Gi pin - 33 nos , Alu.Knob - 3 no , Stay set - 2 Set , Stay plate - 2 nos , Stay wire - 10 kg , GI Thimbles - 6 nos , Stay shackle HT - 4 nos , RSJ for DT Support - 300 Kg , pole Concreting - 4 Loc , Pole Earthing - 4 , ACSR 7/4.09 - 718 mt , AAAC 7/2.50 - 1155 mt , Bolt & Nut 3 1/2 x 5/8 - 21 kg , MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |
| 2 | Shifting of Double pole DT Structure with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 5 kg , Bolt & nut 3 1/2 x 5/8 - 5 kg , Bolt & nut 4 1/2 x 5/8 - 5 kg , Bolt & nut 6 x 5/8 - 5 kg , Bold & nut 12 x 5/8 - 5 kg , MS Washer - 5 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 3 nos , LT LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |
| 3 | Shifting of Single Pole DT Structure with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr long RCC Pole(Square sec) - 2 nos , Base plate - 2 nos , 22 KV Standalone Complete set - 2 Set , GI wire - 80 kg , Earth Pipe - 6 nos , HT LAS - 6 nos , LT LAS - 6 set , Bolt & nut 3 1/2 x 5/8 - 6 kg , Bolt & nut 4 1/2 x 5/8 - 6 kg , Bolt & nut 6 x 5/8 - 4 kg , MS Washer - 4 kg , Structure concreting - 2 Loc
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |
| 4 | 'Shifting of DP Structure with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Double Channel cross Arm - 1 no , Cross Bracing Set - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 6 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 2 nos , GI wire - 40 kg , Bolt & nut 2 1/2x5/8 - 5 kg , Bolt & nut 3 1/2 x 5/8 - 5 kg , Bolt & nut 4 1/2 x 5/8 - 5 kg , Bolt & nut 6 x 5/8 - 5 kg , Bold & nut 12 x 5/8 - 5 kg , MS Washer - 5 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , Tapping Channel - 2 nos , Guarding Cross arm - 2 nos , Back Clamp 9 Mt - 2 nos , 22KV LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |