Tendering Authority: Municipal Administration And Water Supply Department
Tender ID4878615
Organisation NameMunicipal Administration And Water Supply Department
Tender BriefCorrigendum : Shifting Of Eb Pole Lt Ht Line And Transformer From Annanagar 7th St Bridge To Anna Nagar 10th Bridge In Tcmc
Last Date For Submission17th Jul, 2026
Opening Date17 Jul, 2026
Cost
Document Cost0.00
EMD8500.00
Estimated Cost850000.00
Location
CityTHOOTHUKUDI
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Shifting of Over Head Line upto a length of 210m with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials 9 Mt PSC Pole - 5nos , 8 Mt PSC Pole - 1 no , Base plate - 6 Nos , Tapping channel - 12 Nos , 4 1/2 Cross arm - 4 Nos , HT TI Fitting - 4 Nos , 3 Ph Cross Arm - 30 Nos , S Ph Cross Arm - 11 Nos , LT TI Fitting - 1 no , Back Clamp 9 mt - 28 nos , Back Clamp 8 Mt -1 no , Stay clamp 9 Mt - 21 Pair , Stay clamp 8 Mt - 1 Pair , 22 KV Polymer Insulator - 24 Nos , 22 KV polymer Disc - 9 nos , HT Metal parts - 9 nos , LT Shackle - 48 nos , LT metal parts - 48 nos , LT pin insulator - 33 nos , LT Gi pin - 33 nos , Alu.Knob - 3 no , Stay set - 2 Set , Stay plate - 2 nos , Stay wire - 10 kg , GI Thimbles - 6 nos , Stay shackle HT - 4 nos , RSJ for DT Support - 300 Kg , pole Concreting - 4 Loc , Pole Earthing - 4 , ACSR 7/4.09 - 718 mt , AAAC 7/2.50 - 1155 mt , Bolt & Nut 3 1/2 x 5/8 - 21 kg , MS Washer - 4 Kg including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate )1.001Nos(One Number)
2Shifting of Double pole DT Structure with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials 9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 5 kg , Bolt & nut 3 1/2 x 5/8 - 5 kg , Bolt & nut 4 1/2 x 5/8 - 5 kg , Bolt & nut 6 x 5/8 - 5 kg , Bold & nut 12 x 5/8 - 5 kg , MS Washer - 5 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 3 nos , LT LAS - 3 nos including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate )1.001Nos(One Number)
3Shifting of Single Pole DT Structure with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials 9 Mtr long RCC Pole(Square sec) - 2 nos , Base plate - 2 nos , 22 KV Standalone Complete set - 2 Set , GI wire - 80 kg , Earth Pipe - 6 nos , HT LAS - 6 nos , LT LAS - 6 set , Bolt & nut 3 1/2 x 5/8 - 6 kg , Bolt & nut 4 1/2 x 5/8 - 6 kg , Bolt & nut 6 x 5/8 - 4 kg , MS Washer - 4 kg , Structure concreting - 2 Loc including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate )1.001Nos(One Number)
4'Shifting of DP Structure with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials 9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Double Channel cross Arm - 1 no , Cross Bracing Set - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 6 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 2 nos , GI wire - 40 kg , Bolt & nut 2 1/2x5/8 - 5 kg , Bolt & nut 3 1/2 x 5/8 - 5 kg , Bolt & nut 4 1/2 x 5/8 - 5 kg , Bolt & nut 6 x 5/8 - 5 kg , Bold & nut 12 x 5/8 - 5 kg , MS Washer - 5 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , Tapping Channel - 2 nos , Guarding Cross arm - 2 nos , Back Clamp 9 Mt - 2 nos , 22KV LAS - 3 nos including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate )1.001Nos(One Number)