| 1 | Shifting of Over Head Line upto a length of 210m with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
42 'RSJ (470 KG Each) - 470 Kg ,Base plate - 1 No , Tapping channel - 3 Nos , Back clamp for RSJ - 1 no , Stay clamp for RSJ - 1 Pair , 22 KV Polymer Insulator - 3 Nos , 22 KV polymer Disc - 6 nos , HT Metal parts - 6 nos , pole Concreting - 1 Loc , GI Wire - 5 Kg , AAAC 7/2.50 - 158 mt
, Bolt & Nut 3 1/2 x 5/8 - 1 kg , MS Washer - 1 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |
| 2 | Shifting of Over Head Line upto a length of 290m with unarmoured cable and psc pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mt PSC Pole - 1no , 42 'RSJ (478 KG Each) - 2868 Kg
, Base plate - 6 Nos , Tapping channel - 2 Nos , 4 1/2 Cross arm - 6 Nos , HT TI Fitting - 6 Nos , 3 Ph Cross Arm - 14 Nos , S Ph Cross Arm - 8 Nos , Back Clamp 9 mt - 8 nos
, Back clamp for RSJ - 14 nos , Stay clamp 9 Mt - 7 Pair
, Stay clamp for RSJ - 8 Pair , 22 KV Polymer Insulator - 24 Nos , 22 KV polymer Disc - 15 nos , HT Metal parts - 15 nos
, LT Shackle - 36 nos , LT metal parts - 36 nos
, LT pin insulator - 14 nos , LT Gi pin - 14 nos , Alu.Knob - 2 nos , Stay set - 4 Set , Stay plate - 4 nos , Stay wire - 20 kg
, GI Thimbles - 4 nos , Stay shackle HT - 8 nos
, pole Concreting - 7 Loc , GI Wire - 35 Kg , ACSR 7/4.09 - 784 mt , AAAC7/3.15 - 252 mt , AAAC 7/2.50 - 321 mt
, Bolt & Nut 3 1/2 x 5/8 - 4 kg , Bolt & Nut 4 1/2 x 5/8 - 4 Kg
, MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |