| 1 | Shifting of Over Head Line upto a length of 490m with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mt PSC Pole - 2 nos , 42 'RSJ (470 KG Each) - 2390 Kg
, Base plate - 5 Nos , Tapping channel - 14 Nos
, 4 1/2 Cross arm - 2 Nos , HT TI Fitting - 6 Nos , 3 Ph Cross Arm - 22 Nos , S Ph Cross Arm - 5 Nos , Back Clamp 9 mt - 8 nos , Back clamp for RSJ - 13 nos , Stay clamp 9 Mt - 7 Pair , Stay clamp for RSJ - 13 Pair , 22 KV Polymer Insulator - 23 Nos , 22 KV polymer Disc - 6 nos , HT Metal parts - 6 nos , LT Shackle - 36 nos , LT metal parts - 36 nos , LT pin insulator - 18 nos , LT Gi pin - 18 nos , Alu.Knob - 2 no , Stay set - 2 Set , Stay plate - 2 nos , Stay wire - 10 kg , GI Thimbles - 4 nos , Stay shackle HT - 4 nos , pole Concreting - 7 Loc , GI Wire - 35 Kg , ACSR 7/4.09 - 624 mt , AAAC 7 / 3.15 - 185 mt , AAAC 7/2.50 - 690mt , Bolt & Nut 3 1/2 x 5/8 - 4 kg , Bolt & Nut 4 1/2 x 5/8 - 4 Kg , MS Washer - 4 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |
| 2 | Shifting of DT Structure with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 2 nos , Base plate - 2 nos , Tr.Str.Mat.complete set - 1 no , Tr.Str.Clamp - 1 no , Stay set - 4 nos , Stay plate - 4 nos , Stay wire - 20 kg , Stay clamp 9 mt - 4 pair , GI Thimbles - 8 nos , Stay Shackle HT - 8 nos , Earth pipe - 3 nos , GI wire - 50 kg , Bolt & nut 2 1/2x5/8 - 3 kg , Bolt & nut 3 1/2 x 5/8 - 3 kg , Bolt & nut 4 1/2 x 5/8 - 3 kg , Bolt & nut 6 x 5/8 - 3 kg , Bold & nut 12 x 5/8 - 3 kg , MS Washer - 3 kg , Structure concreting - 1 Loc , 22 KV AB Switch Complete set - 1 Set , 22 KV HG Fuse - 1 set , 22 KV polymer insulator - 6 nos , 22 KV LAS - 3 nos , LT open type fuse unit - 2 nos , LT LAS - 3 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 128.003 | 1Nos(One Number) |