| 1 | Shifting of Over Head Line upto a length of 280m with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mt PSC Pole - 3nos , 8 Mt PSC Pole - 1 no , 42 'RSJ (478 KG Each) - 956 Kg , Base plate - 6 Nos , Tapping channel - 16 Nos , 4 1/2 Cross arm - 6 Nos , HT TI Fitting - 6 Nos , 3 Ph Cross Arm - 41 Nos , S Ph Cross Arm - 16 Nos , Back Clamp 9 mt - 30 nos , Back clamp for RSJ - 8 nos , Back Clamp 8 Mt - 1 no , Stay clamp 9 Mt - 20 Pair , Stay clamp for RSJ - 6 Pair , Stay clamp 8 Mt - 1 Pair , 22 KV Polymer Insulator - 35 Nos , 22 KV polymer Disc - 9 nos , HT Metal parts - 9 nos , LT Shackle - 80 nos , LT metal parts - 80 nos , LT pin insulator - 37 nos , LT Gi pin - 37 nos , Alu.Knob - 1 no , Stay set - 2 Set , Stay plate - 2 nos , Stay wire - 10 kg , GI Thimbles - 4 nos ,. Stay Shackle LT - 2 nos , Stay shackle HT - 2 nos ,RSJ for DT Support - 100 Kg , pole Concreting - 5 Loc , GI Wire - 25 Kg , ACSR 7/4.09 - 765 mt ,AAAC 7/2.50 - 914 mt , Bolt & Nut 3 1/2 x 5/8 - 5 kg , Bolt & Nut 4 1/2 x 5/8 - 5 Kg , MS Washer - 5 Kg
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |
| 2 | Shifting of Double pole DT Structure with unarmoured cable and per pole including Supply Delivery ,shifting and erection of existing pole With Following Materials
9 Mtr PSC pole - 6 nos , Base plate - 6 nos , Tr.Str.Mat.complete set - 3 no , Tr.Str.Clamp - 3 no , Stay set - 12 nos , Stay plate - 12 nos , Stay wire - 60 kg , Stay clamp 9 mt - 12 pair , GI Thimbles - 24 nos , Stay Shackle HT - 24 nos , Earth pipe - 9 nos , GI wire - 150 kg , Bolt & nut 2 1/2x5/8 - 15 kg , Bolt & nut 3 1/2 x 5/8 - 15 kg , Bolt & nut 4 1/2 x 5/8 - 15 kg , Bolt & nut 6 x 5/8 - 15 kg , Bold & nut 12 x 5/8 - 15 kg , MS Washer - 15 kg , Structure concreting - 3 Loc , 22 KV AB Switch Complete set - 3 Set , 22 KV HG Fuse - 3 set , 22 KV polymer insulator - 18 nos , 22 KV LAS - 9 nos , LT open type fuse unit - 5 nos ,LT LAS - 9 nos
including labour and transport Charges For Loading Unloading ,eraction of new materials at new loaction as directed by the departmental of cers . (EB Rate ) | 1.00 | 1Nos(One Number) |