Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4320534 |
|---|---|
| Organisation Name | Cochin Devaswom Board |
| Tender Brief | Annual Maintenance Contract Of Various Buildings At Head Quarters,thrissur |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 15 Jun, 2026 |
| Document Cost | 2950.00 |
|---|---|
| EMD | 42000.00 |
| Estimated Cost | 1676197.00 |
| City | Thrissur |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | 5.00 | No |
| 2 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:Cement mortar 1:4 ( 1 cement: 4 coarse sand) | 100.00 | m2 |
| 3 | Making the opening in brick masonry including dismantling in floor or wallsFor door / window / clerestory window | 31.50 | m2 |
| 4 | Renewing glass panes, with wooden fillets wherever necessary: Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm) | 22.50 | m2 |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 100.000 | m2 |