| 1 | Material and labour for 'C' check ( for every 1500 Hrs/5000 Hrs) & maint of 750 KVA DG set as per the recommendation of manufacturer including replacement of necessary Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring etc complete all as directed and specified by Engineer-In-Charge.
Note :-
(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of
(i) Element, Lub Oli Filter
(ii) Fuel Filter and ring Kit
(iii) Super BYP. Filter element kit
(iv) Seal, O Ring
(v) Premium blue 210 Liter
(vi) Inhibitor corrosion 205 Ltrs
(vii) Air cleaner element
(viii) Element Air cleaner (secondary)
(ix) Strip test
(x) Rocker lever cover gasket
(b) Required T& P shall be arranged by the Contractor at site. | 4.00 | Each Job |
| 2 | Material and labour for 'C' check ( for every 1500 Hrs) & maint of 30 KVA DG set as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring etc complete all as directed and specified by Engineer-In-Charge.
Note :-
(a) The rate quoted deemed to include all materials required for 'B' checking by authorised dealer such as replacement of
(i) Element, Lub Oli Filter
(ii) Fuel Filter and ring Kit
(iv) Seal, O Ring
(v) Premium blue 10 Liter
(vi) Inhibitor corrosion 10 Ltrs
(vii) Air cleaner element
(viii) Element Air cleaner (secondary)
(ix) Foil sealed Strip test
(x) Seperator fuel & water
(b) Required T& P shall be arranged by the Contractor at site. | 2.00 | Each Job |
| 3 | Material and labour for 'C' check ( for every 1500 Hrs) & maint of 500 KVA DG set as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring etc complete all as directed and specified by Engineer-In-Charge.
Note :-
(a) The rate quoted deemed to include all materials required for 'C' checking by authorised dealer such as replacement of
(i) Element, Lub Oli Filter
(ii) Fuel Filter and ring Kit
(iv) Seal, O Ring
(v) Premium blue 10 Liter
(vi) Inhibitor corrosion 10 Ltrs
(vii) Air cleaner element
(viii) Element Air cleaner (secondary)
(ix) Foil sealed test strips
(b) Required T& P shall be arranged by the Contractor at site. | 2.00 | Each Job |
| 4 | Material and labour for 'C' check ( for every 1500 Hrs) & maint of 62.5 KVA DG set as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring etc complete all as directed and specified by Engineer-In-Charge.
Note :-
(a) The rate quoted deemed to include all materials required for 'C' checking by authorised dealer such as replacement of
(i) Element, Lub Oli Filter
(ii) Fuel Filter and ring Kit
(iv) Seal, O Ring
(v) Premium blue 10 Liter
(vi) Inhibitor corrosion 10 Ltrs
(vii) Air cleaner element
(viii) Element Air cleaner (secondary)
(ix) Foil sealed test strips
(b) Required T& P shall be arranged by the Contractor at site. | 2.00 | Each Job |
| 5 | Material and labour for 'C' check ( for every 1500 Hrs) & maint of 125 KVA DG set as per the recommendation of manufacturer including replacement of necessary recommended Lub oil and fuel oil filters, "O" rings, necessary gaskets, clamp nuts, ball washers, adjustment of speed governor, cleaning of exhaust pipe and air cleaner, servicing of turbo charger, servicing to control wiring etc complete all as directed and specified by Engineer-In-Charge.
Note :-
(a) The rate quoted deemed to include all materials required for 'C' checking by authorised dealer such as replacement of
(i) Element, Lub Oli Filter
(ii) Fuel Filter and ring Kit
(iii) Seal, O Ring
(iv) Premium blue 20 Liter
(v) Inhibitor corrosion 15 Ltrs
(vi) Air cleaner element
(vii) Element Air cleaner (secondary)
(viii) Foil sealed test strips
(ix) Seperator fuel & Water
(x) Element CRN Resistor
(b) Required T& P shall be arranged by the Contractor at site. | 4.00 | Each Job |