Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Tamil Nadu Generation And Distribution Corporation Limited
Tender ID4244455
Organisation NameTamil Nadu Generation And Distribution Corporation Limited
Tender BriefCorrigendum : Hairbin Bend 13-15 Suriliyar Upper
Last Date For Submission1st Jun, 2026
Opening Date02 Jun, 2026
Cost
Document Cost0.00
EMD4500.00
Estimated Cost0.00
Location
CityTirunelveli
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Removing and depositing on bank with initial lead of 10m and lift of 2m in Hard Stiff clay,stiff black cotton, Hard earth shales,murram,gravel,stoney earth and earth mixed with small size boulders (SS.20B) including cost of all labour charges, Safety appliances, hire charges for all T&P,loading & unloading charges, lead, lift, etc.,complete as directed by the Engineer at site.71.00cum
2Removal of medium size loose boulders not requiring blasting using mechanical equipment s, drilling by utilising tractor - mounted compressor with Jack hammer Unit, chiselling charges for Breaking the hard rock into small pieces, stacking by JCB 3DX Excavator, loading and unloading into tractors - 2 to 3 Cum capacity to remove all the blockages along the road and from sides of the road, stacking and disposing on the free edge of third hair pin bend of the Penstock road, including cost of all labour charges, Safety and Support Infrastructure charges, hire charges for all T&P, lead, lift etc., complete as directed by the engineer at site.(Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited).30.00cum
3Filling the potholes on the existing road with available metal at site including cost of all labour, lead, lift, head load charges, safety appliances,T & P, etc., complete.67.00cum
4PCC 1:4:8 over the filled potholes on the existing road for movement of vehicles including cost of all materials, labour, lead, lift, head load charges, safety appliances,T & P, etc., complete.27.00cum
5GST 18% as per Govt. Norms1.00Nos
1st Jun, 2026

5 Days Left

WhatsApp