| Tender ID | 4458785 |
|---|---|
| Organisation Name | Kerala State Electricity Board |
| Tender Brief | Corrigendum : Construction Of Additional Ug 11kv Feeder To Kottakkal Town Area Under Electrical Section Kottakkal. |
| Last Date For Submission | 1st Jul, 2026 |
| Opening Date | 04 Jul, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 3597402.00 |
| City | Tirur |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. | 6 | No |
| 2 | Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable). | 700 | m |
| 3 | Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling. | 700 | m |
| 4 | Additional rate for excavation of cable trench of appropriate size (normally 1.2m deep and 0.35m /0.5m wide for single/double run) in exceptionally hard conditions (like in ordinary rock). * (As per the PWD Standard Data book ,ordinary rock is defined as any material which can be quarried or split with crowbars or wedges). | 300 | m |
| 5 | Additional rate for excavating trench on tarred/concrete surface of specified size. | 200 | m |